[XLA] Don't count ops which run "faster than optimal" in our "seconds above optimum" total.
In other words, for the purposes of calculating totals, let the "true optimum" be the smaller of the estimated optimum and the actual runtime. PiperOrigin-RevId: 220383899
Loading
Please sign in to comment